Water Distribution System is between drift eliminator and tower fill in the tower. It provides distribution of hot water, coming from facility homogenously on fills inside of tower. If the water temperature is lower than 55 ˚C, the material of main pipe and by-pass is PVC; if it is higher, they are produced from Polypropylene or FRP (Fiberglass Reinforced Polyester).
Main Pipe and bypass are produced with flashed connection so that they can be easily fixed and pulled apart. It is produced without needing cut/paste operations while maintenance period.